Week #10 (August 18, 2018)

No concrete slab yet, but the small delays (rain, etc) gave extra time for Wayan, the builder, to add additional drainage pipes into the support columns. This will allow water to drain from the flat roof into four columns at each corner of the space (the architects didn’t include that detail).