Week #25 — Some doors installed, and much more

Construction crews have now built all of the columns for the final ceiling / flat roof. Once the columns are up then the workers start to connect beams from column to column. From there they place bamboo sticks every foot or so to support a plywood base for the concrete pour (in approx. 12 days).

In the meantime the electrical and plumbing crew are hard at work wiring the place up. There have been a few hiccups on the placement of plugs, switches, and even air conditioning units. I will take the responsibility for these problems, as I didn’t force my builder to review the MEP (mechanical, electrical & plumbing) team’s plans. We used plans from my architect, but then I made changes with my builder, and those changes were not properly reviewed. Part of the problem rests with language barriers as well.

Photo: Standing at the future pool and guest walkway, straight ahead. The building shows a large terrace above the bamboo sticks. That will become the landing for entry into the upper two guest apartments. Below that are two apartments as well (each with a loft)

Making changes at this stage is the most economical, as most of the time it involves material that has not been finished. In other words, moving an electrical outlet for example involves ripping some brick and moving the wire, but the finishing coat of plaster and paint has not been applied yet so it’s generally a quick fix.


Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.