Week #08

Workers returned with a vengeance. All of the foundation holes are completed: 44 holes, each between 3-5 meters deep. Steel and concrete to fill the remaining holes are almost done. Forms are being built for the retaining and boundary walls,…

Week #07

A LOT of dirt was moved around the property over a period of three days, in preparation for an open basement / parking area. Due to the limited size of the property we decided to be as efficient as possible…

Week #06

An exciting week, as two cement trucks, a pump truck, and a sizable crew poured the four walls for the future swimming pool. In addition, foundation walls and columns went up for the guest side of the living space. A…

Week #04

This week over 75% of the holes were drilled to support the foundation for our future retreat. In addition, steel rebar “cages” were built and placed into the holes in order to increase the strength of the concrete. Unfortunately, the…