Week #25 — Some doors installed, and much more

Construction crews have now built all of the columns for the final ceiling / flat roof. Once the columns are up then the workers start to connect beams from column to column. From there they place bamboo sticks every foot or so to support a plywood base for the concrete pour (in approx. 12 days).

In the meantime the electrical and plumbing crew are hard at work wiring the place up. There have been a few hiccups on the placement of plugs, switches, and even air conditioning units. I will take the responsibility for these problems, as I didn’t force my builder to review the MEP (mechanical, electrical & plumbing) team’s plans. We used plans from my architect, but then I made changes with my builder, and those changes were not properly reviewed. Part of the problem rests with language barriers as well.

Photo: Standing at the future pool and guest walkway, straight ahead. The building shows a large terrace above the bamboo sticks. That will become the landing for entry into the upper two guest apartments. Below that are two apartments as well (each with a loft)

Making changes at this stage is the most economical, as most of the time it involves material that has not been finished. In other words, moving an electrical outlet for example involves ripping some brick and moving the wire, but the finishing coat of plaster and paint has not been applied yet so it’s generally a quick fix.


Mugging for the camera

Each time I arrive on the building site I get a hello and a wave from at least one of the many workers. Usually from quite a few. And when I raise my camera phone I tend to get a thumbs-up reaction, as a friendly imitation of my daily thumbs-up to the workers.

Today one of the workers signaled that he wanted me to photograph him. He had a few friends watching him and so he made an effort to overcome his shyness when appearing in front of a foreigner. I really appreciated his efforts and the photos tell the story:


Week #24 — Half the roof is done!

An exciting week here in good old Pererenan. We’ve been fortunate to stay ahead of the rainy season and cover half of the building with a roof. The other half is about two weeks away.

In the meantime we have a crew for building brick walls and then plastering them. When needed the mechanical, electrical and plumbing (MEP) crew come out and set wires into the brick walls:

They also run water pipes through the walls, as well as prepare the drainage system. Offsite, a windows and door crew are working with aluminum and glass.

Tomorrow we meet with a custom furniture maker and will see whether his prices are affordable.


Week #23 — More brick walls, plaster, and form work

There are now a total of four teams that are working daily on the project:

  • Construction crew
  • MEP crew (mechanical, electrical & plumbing)
  • Brick & plaster crew
  • Windows and doors

I am not even certain of the number of people altogether, since I haven’t visited the window and door manufacturer (as usual in Bali the products are custom made). My builder arranged for the quote.

In about five days the final pouring of the residential side of the building will take place, as well as the mezzanine level of the two upstairs guest units. Then a final pour for the guest roof and we will be in great shape!


Week #22 — Staircases, finishing concrete, and more

The structure is changing rapidly now and it’s exciting to see the development on a daily basis. There were months when the progress was like this: holes dug in the ground, mud, then more holes, more mud; concrete and steel going into the holes, then more concrete and steel (don’t forget the mud); and finally a slab of concrete that covered up the holes and… lo and behold — a future parking area/basement.

Now we see brick walls and ceilings being covered with a form of cement plaster that will either go untouched or painted. We see stairs connecting one level to another. We see beams and plywood forms going into place for a flat concrete roof. And an electrical pole going in for our very own electricity.

Things are happening dude.