An exciting week, as two cement trucks, a pump truck, and a sizable crew poured the four walls for the future swimming pool.
In addition, foundation walls and columns went up for the guest side of the living space.
A well was installed at a depth of 45 meters. We hit super hard rock and so we didn’t get as far as was hoped (60 meters).
The on-site building crew returned to their village for a week of prayers and local ceremonies.
The timing is quite good, as we hired an excavator to dig out the future driveway and parking area, which will be positioned under 1/3 of the living space: