There is a lot of momentum to get our retreat finished, but it may not be done until the end of April. I was hoping for an earlier open but I am guilty for creating two new projects:

A little pond is being built next to the shallow section of the swimming pool for the children in all of us. I’ve also added a massage room:

In addition the rooftop bar is in the process of getting the bar built:

And to top off the week we were able to install WiFi for all of the rooms via a kickass Ubiquity networks gadget:

We also had consulting meetings with a hydroponic specialist, a landscaper, and a pond “decorator” (I don’t know the technical term for someone who makes a built pond look like it was always in nature).
Onwards!
